serv_ferroviari
Reil links

www.oekombi.at

5 trains per day: Trento-Woergl
5 trains per day: Woergl-Trento
4 trains per day: Trento-Regensburg
4 trains per day: Regensburg-Trento
1 train per day: Trento-Cologne
1 train per day: Cologne-Trento
1 train per day: Trento-Nuremberg
1 train per day: Nuremberg-Trento
1 train per day: Trento-Forlì
1 train per day: Trento-Piacenza
1 train per day: Trento-Ravenna
1 train per day: Trento-Domegliara-Bondeno (FE)
1 train per day: Trento-Bologna (Intermodal platform)
1 train per day: Bologna (Intermodal platform)-Trento

Interbrennero facts and figures

2,200,000 tonnes of goods transported by rail (with Ro-Ro service)

300,000 tonnes of goods transported by rail (unaccompanied)

250,000 tonnes of inert goods transported by rail (conventional)
serv_fer_1Accompanied rail transport (Ro-Ro)

The entire truck is loaded onto the train, while the driver rests for the period required by law in dedicated carriages.

Unaccompanied rail transport

The container, swap body or trailer is loaded onto the train.

Conventional rail transport

Inert goods, loose material, timber or palletizable goods are loaded onto the train 
serv_fer_2